Complete lining of 20 Tons Melting Furnace
Complete lining of 20 Tons Melting Furnace
Checking The Slope Before Casting Ramp
Checking The Slope Before Casting Ramp
Casting The Side Wall
Casting The Side Wall
Casting The Rear Wall
Casting The Rear Wall
Casting The Hearth Hot Face
Casting The Hearth Hot Face
Casting Back-Up for Ramp
Casting Back-Up for Ramp
Mechanical Works for Roof
Mechanical Works for Roof
Installation Site for Melting Furnace
Installation Site for Melting Furnace
Installation Site for Holding Furnace
Installation Site for Holding Furnace
Demolishing The Refractory for Side Wall
Demolishing The Refractory for Side Wall
Demolishing The Refractory for Rear Wall
Demolishing The Refractory for Rear Wall
Demolishing The Refractory for Melting Door
Demolishing The Refractory for Melting Door
Switch To Desktop Version