Tighten the Bolts and Nuts
Tighten the Bolts and Nuts
Mould Preparation for Casting
Mould Preparation for Casting
Installing the Precast Block
Installing the Precast Block
Installing Anchoring System
Installing Anchoring System
Dismantling the Refractory
Dismantling the Refractory
Complete Casting Refractory and Precast Block
Complete Casting Refractory and Precast Block
Vibrating Castable
Vibrating Castable
Pouring in Castable After Finish Setting Mould
Pouring in Castable After Finish Setting Mould
Installing Steel Mould Before Casting
Installing Steel Mould Before Casting
Finished Casting One Section
Finished Casting One Section
Complete Casting the Burner Pipe
Complete Casting the Burner Pipe
Anchoring System & Ceramic Fibre Works
Anchoring System & Ceramic Fibre Works
Water Levelling of Steel Ring
Water Levelling of Steel Ring
Second Round of Precast Block (PB)
Second Round of Precast Block (PB)
Lining of Last Round
Lining of Last Round
Installing Fibre Blanket and Start Install 1st PB
Installing Fibre Blanket and Start Install 1st PB
Complete Lining 3rd Round
Complete Lining 3rd Round
Complete Install of 1 Unit CVF
Complete Install of 1 Unit CVF
Switch To Desktop Version